Lincoln Nautilus Manuals

Lincoln Nautilus: Climate Control System - General Information / Reset the Outside Air Temperature Sensor Learned Values. General Procedures

Lincoln Nautilus 2018-2025 Service Manual / Electrical / Climate Control System / Climate Control System - General Information / Reset the Outside Air Temperature Sensor Learned Values. General Procedures

Configuration

  1. NOTE: The ambient air temperature sensor is a critical component for correct Air Conditioning (A/C) and Heating, Ventilation, and Air Conditioning (HVAC) system operation. Make sure after the reset is carried out the temperature is displaying correctly in the vehicle.

    NOTE: The outside air temperature sensor is also referred to as the ambient air temperature sensor in this manual.

    Using the diagnostic FDRS scan tool, follow the on screen prompts to run and reset the outside air temperature sensor learned values.

    Refrigerant System Tests - 2.0L EcoBoost (184kW/250PS) – MI4. General Procedures

    Inspection NOTE: Procedure 1 — Ambient Temperature below 21 °C (70 °F). NOTE: Proper A/C system diagnosis on a vehicle’s compressor is dependent on correct refrigerant system charge and tested in ambient temperatures above 21°C (70°F)...

    Air Conditioning (A/C) Compressor - 2.0L EcoBoost (184kW/250PS) – MI4. Removal and Installation

    Removal NOTICE: If installing a new A/C compressor due to an internal failure of the old unit, carry out the following procedures to remove contamination from the A/C system...

    Other information:

    Lincoln Nautilus 2018-2025 Owners Manual: All-Wheel Drive


    How Does All-Wheel Drive Work All-wheel drive uses all four wheels to power the vehicle. This increases traction, enabling you to drive over terrain and road conditions that a conventional two-wheel drive vehicle cannot. The AWD system turns on when needed and does not require input from you...

    Lincoln Nautilus 2018-2025 Service Manual: Cylinder Bore Taper. General Procedures


    Check NOTE: Refer to the appropriate Section 303-01 for the specification. Measure the cylinder bore at the top, middle and bottom of piston ring travel in 2 directions as indicated. Verify the cylinder bore is within the wear limit. The difference indicates the cylinder bore taper...

    Categories

    Traction Control

    How Does Traction Control Work

    If your vehicle begins to slide, the system applies the brakes to individual wheels and, when needed, reduces power at the same time. If the wheels spin when accelerating on slippery or loose surfaces, the system reduces power in order to increase traction.

    Switching Traction Control On and Off

    WARNING: The stability and traction control light illuminates steadily if the system detects a failure. Make sure you did not manually disable the traction control system using the information display controls or the switch. If the stability control and traction control light is still illuminating steadily, have the system serviced by an authorized dealer immediately. Operating your vehicle with the traction co

    read more

    Copyright © 2025 www.linautilus.com